PROJECT PROFILE
PROJECT: Coal-Fired Power Station – Pump Refurbishment
LOCATION: United Kingdom One of the cold water pumps at
this coal-fired power station had been earmarked for
refurbishment after a routine maintenance inspection on
account of the heavy “wear and tear”, to which it had been
subjected over many years of use.
The client sought a high performance coating that would
protect the pump, but not affectits efficiency.

 

 

 

 

 


THE SOLUTION
The surfaces of the pump to be coated were abrasive blast cleaned to a minimum industry standard of Sa21/2 prior to the
application of two coats of our solventfree ceramic epoxy coating Cerami-Tech CR in contrasting colours – Grey and
Blue. This is done to help check that both coats have been applied and to make sure that no areas have been missed.
Cerami-Tech CR provides a smooth, low friction finish as well as optimum levels of physical & mechanical strength and
superior resistance to erosion and corrosion. It is ideal for use as a resurfacing and lining system in fluid flow
environments.

 

 

 

 

 